Energy Efficiency Portfolio Program - Pre-qualified Measures



Change control log
PREQUALIFIED MEASURES
Definition of prequalified measures
Prequalified measures have been found likely to be cost effective in most applications. Site specific (without administrative costs) measure-level TRC screening is not required for prequalified measures but is required for prescriptive measures that have not been prequalified.
Residential Single Family - Electric
Measure
Generic TRC w/CO2
Reference
Upstate
Downstate
Source
Date
CFL bulb9.412.6Order01/04/10
Dehumidifier1.11.5Order01/04/10
ECM fan for ground source heat pump1.3N/AOrder01/04/10
Through-wall air conditioner2.75.0Order01/04/10
Window air conditioner6.712.3Order01/04/10
NYC CAC SEER 151.31.3Order01/04/10
NYC CAC SEER 15 w/QI1.81.8Order01/04/10
NYC CAC SEER 161.11.1Order01/04/10
Ground source heat pumps are not prequalified
Residential Single Family – Gas
Measure
Generic TRC w/CO2
Reference
Upstate
Downstate
Source
Date
Air sealing 2.53.3Order06/24/10
Boilers (HW) – 85% AFUE2.81.9Order06/24/10
Boilers (steam) – 82% AFUE4.63.2Order06/24/10
Furnaces – 90% AFUE4.42.6Order06/24/10
Furnaces – 92% AFUE w/ ECM2.31.6Order06/24/10
Hot water storage tank indirect 80 EF1.51.5Order06/24/10
DHW pipe insulation6.07.9Order06/24/10
Seal and insulation ductwork 1.81.5Order06/24/10
Multi - family - Electric
Measure
Generic TRC w/CO2
Reference
Upstate
Downstate
Source
Date
Through-wall air conditioner2.75.0Order07/27/09
Window air conditioner6.712.3Order07/27/09
CFL bulb12.69.4Order07/27/09
CFL TRC adjusted 01/04/10 due to lower bulb price
The 06/24/09 order (p.15) reports a TRC ratio of0.8 for large geothermal systems in apartment buildings that often require extensive new piping, projects will be permitted with “rigorous project pre-screening” with a TRC of 1.0.
Multi - family - Gas
Measure
Generic TRC w/CO2
Reference
Upstate
Downstate
Source
Date
Boilers (HW) 85% AFUE3.94.1Order07/27/09
Boilers (steam) 82% AFUE4.02.8Order07/27/09
Furnaces 90% AFUE3.72.5Order07/27/09
Boiler 90% AFUE8.22.5Order07/27/09
Duct sealing/insulation1.51.3Order07/27/09
Notes:
N/A- Not Applicable





Change Control log
DateChanges Made

File Attachment Icon
prequalified grandfathered measures.docx