Demonstration Project | Summary | Related Documents |
Aggregated Behind the Meter Energy Storage | NYSEG will enroll and aggregate up to eight customers in a battery storage offering, with a total targeted capacity of 1.06MW and 4.2MWh. Customers will receive a guaranteed bill-saving benefit from the installed battery storage system without having to pay the upfront costs of that installation, and in return will pay a nominal fee to NYSEG and its market partner.
REV objectives addressed include: market animation, system-wide efficiency, rate design, shared value streams | Initial Filing - 4/20/18
Implementation Plan - 6/29/18
Q3 2018 Update - 10/31/18
Q4 2018 Report - 1/31/19
Q3 2019 Report - 10/31/19
Q4 2019 Report - 1/31/20
Q1 2020 Report - 4/30/20
Q2 2020 Report - 7/31/20
Q3 2020 Report - 10/31/20
Q4 2020 Report - 1/31/21 |
Electric School Bus V2G | ConEd in partnership with a local school bus operator, will purchase five electric school buses for use in the White Plains public school district. During the school year, the five electric buses will be used for student transportation. During the summer, the buses will be used as energy storage to meet system needs.
REV objectives addressed include: 3rd-party partnerships, reducing CO2 emissions, shared value streams, advanced distribution management, system-wide efficiency | Initial Filing - 6/8/18
Q3 2018 Report - 10/31/18
Q4 2018 Report - 1/31/19
Q1 2019 Report - 4/30/19
Q2 2019 Report - 7/31/19
Q3 2019 Report - 10/31/19
Q4 2019 Report - 1/31/20
Q1 2020 Report - 4/30/20
Q2 2020 Report - 7/31/20
Q3 2020 Report - 10/31/20
Q4 2020 Report - 2/1/21 |
REV Demonstration Project City of Schenectady | National Grid, partnering with the City of Schenectady, will use street light infrastructure as a platform to deploy smart city technologies and services using connected devices and a low bandwidth wireless network. Three business models will be tested: Enhancing utility owned infrastructure, hybrid utility and smart city vendor shared infrastructure, and support city owned smart city infrastructure.
REV objectives addressed include: market animation, enhanced customer knowledge, leveraging customer contributions, reducing CO2 emissions, transactive grid, energy efficiency | Initial Filing - 3/26/18
Q4 2018 Report - 1/31/19
Q1 2019 Report - 4/30/19
Q2 2019 Report - 7/31/19
Q3 2019 Report - 10/31/19
Q4 2019 Report - 1/31/20
Q1 2020 Report - 4/30/20
Q2 2020 Report - 7/31/20
Q3 2020 Report - 10/30/20
Q4 2020 Report - 1/29/21 |
Optimal Export Demonstration Project | O&R is partnering with a tech company to use its platform to increase hosting capacity through the use of new technology, reducing interconnection costs, and creating new revenue streams for the utility. This demonstration tests whether a new protection methodology with corresponding monitoring and control technology, and offering a variety of interconnection options to developers, will increase hosting capacity on a circuit.
REV objectives addressed include: leveraging customer contributions, system-wide efficiency, system reliability and resiliency, market rules and standards | Initial Filing - 10/23/17
Implementation Plan - 6/29/18
Q4 2018 Report - 1/31/19
Q1 2019 Report - 4/30/19
Q2 2019 Report - 7/31/19
Q3 2019 Report - 10/30/19
Q4 2019 Report - 1/31/20
Q1 2020 Report - 4/30/20 |
Innovative Storage Business Model | O&R uses a partner's battery and optimization technology to demonstrate an innovative storage business model which the partners believe has the potential to realize the unique attributes of energy storage and enable its wide-scale deployment. The batteries in this demonstration will be used to reduce host customers' demand charges while also being dispatched for the benefit of the overall grid.
REV objectives addressed include: system-wide efficiency, system reliability and resiliency, transactive grid | Initial Filing - 2/6/2018
Implementation Plan - 6/29/18 |
Integrated Electric Vehicle Charging & Battery Storage System | RG&E is installing battery storage, level 2 EV chargers, and fast DC chargers at its 1300 Scottsville Road operations center. The Company will use the battery storage system to minimize the cost impact of the EV chargers, which will be used by the Company's fleet as well as being available to the public. The Company will also attempt to stack the battery system's value in other ways, where possible.
REV objectives addressed include: market animation, system-wide efficiency, rate design, shared value streams | Implementation Plan – 6/8/18
Q3 2018 Report - 10/31/18
Q4 2018 Report - 1/31/19
Q3 2019 Report - 10/31/19
Q1 2020 Report - 4/30/20
Q3 2020 Report - 10/31/20 |
CenHub Marketplace | Central Hudson partners with a tech company to build an online portal for energy products and services to provide customers with personalized recommendations and offer an enhanced data analytics package for customers who want greater insight into their energy use.
REV objectives addressed include: Enhanced Customer Knowledge and Tools for Effective Total Energy Bill Management; Market Animation | Initial Filing - 7/1/15
Compliance Letter - 8/3/15
Staff Assessment - 11/10/15
Implementation Plan - 12/10/15
Q1 2016 Report - 4/29/16
Q2 2016 Report - 8/1/16
Q3 2016 Report - 10/31/16
Q4 2016 Report - 1/31/17
Q1 2017 Report - 5/1/17
Q2 2017 Report - 7/31/17
Q3 2017 Report - 10/31/17
Q4 2017 Report - 1/31/18
Q1 2018 Report - 4/3018
Q2 2018 Report - 7/31/18
Q4 2018 Report - 1/13/19 |
Customer Engagement Marketplace Platform | Orange & Rockland partners with a tech company to build an online engagement platform that leverages customer data and analytics to help customers find energy products and services that meet their needs.
REV objectives addressed include: Enhanced Customer Knowledge and Tools for Effective Total Energy Bill Management; Market Animation | Initial Filing -7/1/15
Compliance Letter -8/3/15
Staff Assessment 11/10/15
Implementation Plan - 11/20/15
Q1 2016 Report - 5/2/16
Q2 2016 Report - 8/1/16
Q3 2016 Report - 10/31/16
Q4 2016 Report - 1/31/17
Q1 2017 Report - 4/28/17
Q2 2017 Report - 7/31/17
Q3 2017 Report - 10/27/17
Q4 2017 Report - 1/31/18
Q1 2018 Report - 4/30/18
Q2 2018 Report - 7/31/18
Q3 2018 Report - 10/31/18
Q4 2018 Report - 1/31/19 |
Building Efficiency Marketplace | Consolidated Edison partners with a tech company to build a clean energy project origination, bidding, and technical support platform for small commercial customers. The platform will analyze interval meter data to identify high potential projects that can be put out to bid on the platform, with technical support and financing options facilitated by Con Edison.
REV objectives addressed include: Enhanced Customer Knowledge and Tools for Effective Total Energy Bill Management; Market Animation | Initial Filing - 7/1/15
Compliance Letter - 8/3/15
Staff Assessment - 11/10/15
Implementation Plan - 11/20/15
Q1 2016 Report - 5/2/16
Q2 2016 Report - 7/29/16
Q3 2016 Report - 10/31/16
Q4 2016 Report - 1/30/17
Q1 2017 Report - 4/28/17
Q2 2017 Report - 7/28/17
Q3 2017 Report - 10/27/17
Q4 2017 Report - 1/29/18
Q1 2018 Report - 4/30/18
Q2 2018 Report - 7/26/18
Q3 2018 Report - 10/31/18
Q4 2018 Report - 1/31/19
Q2 2019 Report and Close Out - 1/13/19 |
Clean Virtual Power Plant | Consolidated Edison partners with DER providers that bundles solar with storage, which when aggregated serves as a “virtual power plant” to provide grid services on blue sky days. The demonstration will also test the demand for a premium resiliency service that leverages the devices to keeps the lights on during an outage. A future phase may also test time of use pricing.
REV objectives addressed include: System Wide Efficiency; Fuel and Resource Diversity; System Reliability and Resiliency | Initial Filing - 7/1/15
Compliance Letter - 8/3/15
Staff Assessment - 11/20/15
Implementation Plan - 12/11/15
Q1 2016 Report - 5/2/16
Q2 2016 Report - 7/29/16
Q3 2016 Report - 10/31/16
Q4 2016 Report - 1/30/17
Notice of Temporary Suspension - 4/28/17 |
CONnectED Homes Platform | Consolidated Edison partners with tech companies to build a marketing platform targeting residential customers with relevant messaging from DER providers on the bill, over email, and through an online marketplace.
REV objectives addressed include: Enhanced Customer Knowledge and Tools for Effective Total Energy Bill Management; Market Animation | Initial Filing - 7/1/15
Addendum Filing - 11/20/15
Compliance Letter - 12/8/15
Staff Assessment - 1/8/15
Implementation Plan - 2/1/16
Q1 2016 Report - 5/2/16
Q2 2016 Report - 7/29/16
Q3 2016 Report - 10/31/16
Q4 2016 Report - 1/30/17
Q1 2017 Report - 4/28/17
Q2 2017 Report - 7/28/17
Q3 2017 Report - 10/27/17
Q4 2017 Report - 1/29/18
Q1 2018 Report - 4/30/18
Q2 2018 Report - 7/26/18
Q3 2018 Report - 10/31/18
Q4 2018 Report - 1/31/19
Q2 2019 Report - 7/31/19
Q3 2019 Report - 10/31/19 |
Flexible Interconnect Capacity Solution | Iberdrola partners with a tech company to offer a new, less costly, and faster way for customers and third parties to connect large distributed generation projects to the grid by providing an “infrastructure as a service” alternative to traditional interconnection, managing the distributed resource on an ongoing basis to avoid the need for new hard infrastructure.
REV objectives addressed include: Market Animation; System Wide Efficiency; System Efficiency, Reliability, and Resiliency | Initial Filing - 7/2/15
Compliance Letter - 8/3/15
Staff Assessment -12/15/15
Implementation Plan - 1/11/16
Q1 2016 Report - 4/29/16
Q2 2016 Report - 8/1/16
Q3 2016 Report - 10/31/16
Q4 2016 Report - 1/30/17
Q1 2017 Report - 5/1/17
Q2 2017 Report - 7/31/17
Q3 2017 Report - 10/31/17
Q4 2017 Report - 1/30/18
Q1 2018 Report - 4/30/18
Q2 2018 Report - 7/31/18
Q3 2018 Report - 10/31/18
Q4 2018 Report - 1/31/19
Q2 2019 Report - 7/31/19
Q3 2019 Report - 10/31/19
Q4 2019 Report - 1/30/20
Q1 2020 Report - 4/30/20
Q2 2020 Report - 7/31/20
Q3 2020 Report - 10/31/20
Q4 2020 Report - 1/31/21 |
Community Energy Coordination | Iberdrola partners with a consulting firm to aggregate local demand for clean energy technologies, target outreach to areas where DERs can provide the greatest system benefits, and orchestrate a bulk purchase from third party providers on behalf of customers to lower costs and increase benefits.
REV objectives addressed include: Enhanced Customer Knowledge and Tools for Effective Total Energy Bill Management; Market Animation | Initial Filing 7/2/15
Compliance Letter - 8/3/15
Staff Assessment - 1/5/16
Implementation Plan - 2/4/16
Q1 2016 Report - 4/29/16
Q2 2016 Report - 8/1/16
Q3 2016 Report - 10/31/16
Q4 2016 Report - 1/30/17
Q1 2017 Report - 5/1/17
Q2 2017 Report - 7/31/17
Q3 2017 Report - 10/31/17
Q4 2017 Report - 4/3/18
Q1 2018 Report - 4/30/18
Q2 2018 Report - 7/31/18
Q3 2018 Report - 10/31/18
Q4 2018 Report - 1/31/19
Q2 2019 Report - 7/31/19
Q3 2019 Report - 10/31/19 |
Resiliency Demonstration in Potsdam | National Grid partners with local customers and DER providers to fund a microgrid through a new tariff design, testing demand for a premium resiliency service. Also includes new metering, billing, and financial services for DER providers.
REV objectives addressed include: System Reliability and Resiliency | Initial Filing 7/1/15
Addendum Filing - 12/7/15
Compliance Letter - 12/15/15
Staff Assessment - 2/10/16
Implementation Plan - 3/11/16
Q1 2016 Report - 5/2/16
Q2 2016 Report - 8/1/16
Q3 2016 Report - 10/31/16
Q4 2016 Report - 1/31/17
Q1 2017 Report - 5/1/17
Q2 2017 Report - 7/31/17
Q3 2017 Report - 10/31/17
Q4 2017 Report - 1/31/18
Q1 2018 Report - 4/30/18
Q2 2018 Report - 7/31/18
Q3 2018 Report - 10/31/18
Q4 2018 Report - 1/31/19 |
Fruit Belt Neighborhood Solar | National Grid aims to help low-to moderate-income customers access clean energy while reducing arrears through a neighborhood solar project in an economically distressed area, and test how solar can be paired with communications technologies to deliver benefits to the overall electricity system.
REV objectives addressed include: Enhanced Customer Knowledge and Tools for Effective Total Energy Bill Management; Market Animation; System Wide Efficiency | Initial Filing - 7/1/15
Erratum Filing - 7/8/15
Compliance Letter - 8/3/15
Staff Assessment - 12/2/15
Implementation Plan - 1/4/16
Q1 2016 Report - 5/2/16
Q2 2016 Report - 8/1/16
Q3 2016 Report - 10/31/16
Q4 2016 Report - 1/31/17
Q1 2017 Report - 5/1/17
Q2 2017 Report - 7/31/17
Q3 2017 Report - 10/31/17
Q4 2017 Report - 1/31/18
Q1 2018 Report - 4/30/18
Q2 2018 Report - 7/31/18
Q3 2018 Report - 10/31/18
Q4 2018 Report - 1/31/19 |
Energy Marketplace | Iberdrola partners with a tech company to launch an online marketplace for customers to buy energy products and services.
REV objectives addressed include: Market animation, energy efficiency, increased customer knowledge, increased DER penetration | Initial Filing - 7/2/15
Addendum Filing - 1/26/16
Staff Assessment - 3/15/16
Implementation Plan - 4/15/16
Q2 2016 Report - 8/1/16
Q3 2016 Report - 10/31/16
Q4 2016 Report - 1/31/17
Q1 2017 Report - 5/1/17
Q2 2017 Report - 7/31/17
Q3 2017 Report - 10/31/17
Q4 2017 Report - 4/3/18
Q1 2018 Report - 4/30/18
Q2 2018 Report - 4/30/18
Q3 2018 Report - 10/31/18
Q4 2018 Report - 1/31/19
Q2 2019 Report - 7/31/19
Q3 2019 Report - 10/31/19 |
BNMC DSP Engagement Tool | National Grid aims to use the Buffalo Niagara Medical Campus as a test-bed for DSP functionalities, coordinating and optimizing DERs throughout the campus.
REV objectives addressed include: Market animation, transactive grid, the leveraging of customer contributions, system efficiency, system reliability and resiliency | Initial Filing - 7/1/15
Addendum Filing - 6/17/16
Compliance Letter - 6/22/16
Q3 2016 Report - 10/31/16
Q4 2016 Report - 1/31/17
Q1 2017 Report - 5/1/17
Q2 2017 Report - 7/31/17
Q3 2017 Report - 10/31/17
Q4 2017 Report - 1/31/18
Q1 2018 Report - 4/30/18
Q2 2018 Report - 07/31/18
Q3 2018 Report - 10/31/18
Q4 2018 Report - 1/31/18 |
Demand Reduction Demonstration Project in Clifton Park | National Grid partners with various clean energy providers to offer customers various programs and pricing signals to manage usage to reduce energy bills and demand during peak times.
REV objectives addressed include: Market animation, increased customer knowledge, energy efficiency | Initial Filing - 7/1/16
Compliance Letter - 7/11/16
Staff Assessment - 12/28/16
Implementation Plan - 1/17/17
Q1 2017 Report - 5/1/17
Q2 2017 Report - 7/31/17
Q3 2017 Report - 10/31/17
Q4 2017 Report - 1/31/18
Q1 2018 Report - 4/30/18
Q2 2018 Report - 7/31/18
Q3 2018 Report - 10/31/18
Q2 2019 Report - 7/31/19
Q3 2019 Report - 10/31/19
Q4 2018 Report - 1/31/19
Q1 2019 Report - 4/30/19
Q3 2019 Report - 10/31/19
Q4 2019 Report - 1/28/20
Q1 2020 Report - 4/30/20
Q2 2020 Report - 7/31/20
Q3 2020 Report - 10/30/20
Q4 2020 Report - 1/29/21 |
Distributed Generation Interconnection | National Grid aims to accelerate the pace and scale of interconnecting distributed generation systems above 50kW through upfront investment by the Company along with alternative cost allocation methodology.
REV objectives addressed include: System-wide efficiency, system reliability and resiliency, fuel and resource diversity, transactive grid | Initial Filing - 2/14/17
Compliance Letter - 4/24/17
Implementation Plan - 5/24/17
Q2 2017 Report - 8/25/17
Q3 2017 Report - 11/17/17
Q4 2017 Report - 1/31/18
Q1 2018 Report - 4/30/18
Q2 2019 Report - 7/30/19
Q3 2019 Report - 10/31/19
Q1 2020 Report - 4/30/20
Q2 2020 Report - 7/31/20
Q3 2020 Report - 10/30/20
Q4 2020 Report - 2/1/21 |
Smart Home Rate | Con Edison and O&R propose combining smart home capabilities with the Companies deployment of Advanced Metering Infrastructure to demonstrate a new pricing framework for residential customers.
REV objectives addressed include: Market animation, system-wide efficiency, pricing and rate design, increased customer knowledge | Initial Filing - 2/1/17
Compliance Letter - 6/6/17
Implementation Plan - 8/24/18
Q3 2018 Report - 10/31/18
Q4 2018 Report - 1/31/19
Q2 2019 Report - 7/31/19
Q3 2019 Report - 10/31/19
Q4 2019 Report - 1/31/20
Q1 2020 Report - 4/31/20
Q3 2020 Report - 10/31/20
Q4 2020 Report - 2/1/21 |
National Grid proposes to leverage the offerings, tools, and price signals being provided in their Clifton Park Project, through additional technology that will enable customers to control appliances in their homes during times when electricity prices are high in order to reduce demand and create energy savings.
REV objectives addressed include: Market animation, system-wide efficiency, pricing and rate design, increased customer knowledge | Initial Filing - 2/1/17
Compliance Letter - 6/6/17 |
NYSEG, RG&E, and their partner will design a smart home rate for EV charging that allows customers to receive a discount for allowing the utility to schedule charging. This will enable the Company and its partner to better understand the degree to which customers and their device behaviors can be learned and influenced through indirect (price) and direct control signals. The Company intends to iterate the rate to better understand electric demand and customer reactions to price changes.
REV objectives addressed include: Market animation, system-wide efficiency, pricing and rate design | Initial Filing - 2/1/17
Compliance Letter - 6/6/17 |
Central Hudson proposes a rate structure where residential customers within a specific geographic area will have the opportunity to enroll in a new time-of-use electric rate, and receive technology from Central Hudson to automatically reduce usage during peak pricing periods.
REV objectives addressed include: Market animation, system-wide efficiency, pricing and rate design | Initial Filing - 2/1/17
Compliance Letter - 6/6/17 |
Commercial Battery Storage | Con Edison aims to address energy storage technologies and associated new business models which increasingly have the potential to support cost-effective solutions for distribution-level grid needs.
REV objectives addressed include: Market animation, system-wide efficiency, leveraging customer contributions, system efficiency | Initial Filing - 1/20/17
Compliance Letter - 1/31/17
Staff Assessment - 5/18/17
Implementation Plan - 6/15/17
Q3 2017 Report - 10/27/17
Q4 2017 Report - 1/29/18
Q1 2018 Report - 4/30/18
Q2 2018 Report - 7/26/18
Q3 2018 Report - 10/31/18
Q4 2018 Report - 1/31/19
Q2 2019 Report - 7/31/19
Q3 2019 Report - 10/31/19
Q4 2019 Report - 1/31/20
Q1 2020 Report - 4/30/20
Q2 2020 Report - 7/31/20
Q3 2020 Report - 10/31/20
Q4 2020 Report - 2/1/21 |
Storage on Demand | Con Edison proposes to test a technology solution and business model that provides the opportunity for two parties to utilize transportable batteries at a higher rate by sharing deployment of the batteries for different purposes at different times through the year.
REV objectives addressed include: Market animation, leveraging customer contributions, system wide efficiency, system reliability and resiliency | Initial Filing - 2/27/17
Staff Assessment - 5/18/17
Implementation Plan - 6/23/17
Q3 2017 Report - 10/27/17
Q4 2017 Report - 1/29/18
Q1 2018 Report - 4/30/18
Q2 2018 Report - 7/26/2018
Q3 2018 Report - 10/31/18
Q4 2018 Report - 1/31/19
Q2 2019 Report - 7/31/19
Q3 2019 Report - 10/31/19
Q4 2019 Report - 1/31/20
Q1 2020 Report - 4/30/20
Q2 2020 Report - 7/31/20
Q3 2020 Report - 10/31/20
Q4 2020 Report - 2/1/21 |
Community Power Demonstration | Con Edison, with a number of partners, will test a novel CDG business model targeted towards LMI customers to show that these projects can be profitably funded. In this demonstration customers will be charged only for actual CDG production, instead of a flat subscription fee. This ensures that customers will be able to pay for the CDG subscription through the savings they receive from bill credits. increasing on-time solar subscription payments. | Initial Filing - 9/24/18
Q2 2019 Report - 7/31/19
Q3 2019 Report - 10/31/19
Q4 2019 Report - 1/31/20
Q1 2020 Report - 4/30/20
Q2 2020 Report - 7/3120
Q3 2020 Report - 10/31/20
Q4 2020 Report - 2/1/21 |
EnergyFit | The EnergyFit demonstration provides a new model for financing and capturing energy efficiency savings in one- to four-family LMI buildings by taking a portfolio approach. Con Edison will develop a standardized set of EE measures, funded by 3rd-party impact investors. The Company expects that these standardized measures will, on average, produce a predictable level of EE savings, allowing these measures to be financed. | Initial Filing - 11/30/18 |
Customer Convenience Demonstration (Withdrawn) | National Grid partners with various clean energy providers to offer customers energy plans with energy efficiency, appliance leasing, and solar offers included
REV objectives addressed include: Market animation, increased customer knowledge, energy efficiency | Initial Filing - 7/1/15
Errata Filing - 7/1/16
Q1 2019 Report - 4/30/19
Q2 2019 Report - 7/31/19
Q3 2019 Report - 10/31/19
Q4 2019 Report - 1/28/20
Q1 2020 Report - 4/30/20
Q2 2020 Report - 7/31/20
Q3 2020 Report - 10/31/20
Q4 2020 Report - 1/29/21 |